IT room envelope.
From plan to connection.

Good installation starts with clear documentation. See how the panel envelope relates to rack layouts, maintenance space and service routes.

This is an illustrative coordination study: one model, three connected sheets. It shows the scope of an installation discussion and the points requiring agreement with the designer.

See drawings for all scopes →
Plan of an illustrative 12 by 8 metre IT zone, with 12 racks, a cold aisle, a separate entrance and a panel envelope

A-01 · Rack layout, equipment fronts, access, partitions and section A-A location.

Download the SVG sheet

Demonstration concept. Dimensions are model assumptions, not standard requirements. A specific project requires system selection and coordination between disciplines.

What must the room design
establish?

Layout and access
Equipment dimensions, rack door opening, component replacement, transport and exit routes. The plan separates the IT room from the entrance zone.
Equipment operating environment
In the example, rack fronts face the cold aisle. Appropriate temperatures, humidity and cooling follow the equipment requirements and HVAC design, including when liquid cooling is used.
Continuity of the enclosure
Walls, connections to the slab and floor, doors and penetrations form one system. An EI classification cannot be selected from panel thickness alone.
Structural and services coordination
Suspensions, supports, slab movement and openings must be agreed before installation. Panel facings alone are not a default support for service routes.

What do we show
within Panel Montage’s scope?

The sandwich panel envelope, partitions, connections and flashings within the agreed documentation scope. These are highlighted in blue on the sheets.

We install sandwich panel walls and ceilings in white wall (composite wall) systems, including in the white space. Some of our installers have data centre experience from previous projects.

Send your envelope design

Elements to coordinate

IT racks, cooling, power, service routes, detection and fire suppression, access control and aisle containment remain separate scopes. We coordinate door openings and penetrations with the relevant trades.

We do not claim a Tier rating, fire resistance classification or room certification on the basis of this example.

Basis of the study

Requirements and technical sources first, followed by our own plan and principal details. Sources accessed: 9 October 2026.

  1. Schneider Electric: Data Center Projects: Establishing a Floor Plan, WP 144 Rev 2

    A-01 and A-02: opposing rack fronts and maintenance aisles; original geometry, not copied drawings.

  2. ASHRAE Handbook 2023: Data Centers and Telecommunication Facilities

    No universal temperature or humidity is specified. Only an air-cooling example is assumed.

  3. Kingspan: Installation guide, Walls & ceiling, Nordics

    Panel layers, support, openings and independent suspensions. Fixing dimensions have not been applied to an unspecified product.

  4. Kingspan: Fire Resistance of Insulated Panels

    No invented EI classification or assignment to a specific Kingspan model. Reaction to fire is not the same as fire resistance.

  5. Hilti / Paroc Panel System / Rf-Technologies: Firestop in sandwich panels

    P1 is a coordination interface; no Hilti/Paroc detail is marked as compatible with Kingspan.

  6. Uptime Institute: Tier Certification

    No Tier III/IV or other rating is assigned to the envelope diagram.

What to send for a quotation

  • IT and service area layout, partition ratings specified by the design and the panel system specification.
  • Service penetration and door drawings, wall and ceiling supports and responsibility for penetration seals.
  • Country, site address, project contact and planned dates.
  • Current drawings, panel schedule, area, installation height and system specification.
  • Responsibilities for materials, unloading, access equipment, scaffolding and a ready work area.
  • Delivery sequence, site access and coordination with other trades.

How we organise installation

  1. We review the documents and agree which works and junctions belong to Panel Montage.
  2. We agree site readiness, delivery sequence, equipment and inspection points before junctions are concealed.
  3. After agreeing the terms, we confirm crew availability. Scope changes, delays and acceptance follow the written project arrangements.
  4. Every week we send the client a report on progress and risks. Additional work is reported in writing before it is carried out.
  5. We make openings for services as coordinated with the other trades. Firestopping of penetrations is a separate scope.
  6. At handover we provide the acceptance record, photos and a snag list.

Examples and documentation

The drawings are a demonstration concept. Our portfolio records documented panel installation; it does not claim complete data centre construction or a Tier rating for those projects.

See documented panel installation

Questions before we start

Does Panel Montage build complete data centres?

Our scope is the agreed panel enclosure, partitions and flashings. IT, power, cooling, detection and fire suppression are separate trades.

Does the example have a Tier rating or verified fire resistance?

No. It is a coordination study. Requirements and ratings must come from the design, system documentation and appropriate assessment procedures.

Do you provide materials and heavy equipment?

The client normally provides materials, a prepared supporting structure and access equipment. Any other division must be agreed separately before pricing.

Can you give a price per m² and a start date immediately?

Pricing depends on the documents, scope and logistics. A fixed price requires a defined scope. We confirm dates after checking crew availability and site readiness.